Lake loop could cost $46.1 million

A 30.5-kilometre shared walking and cycling path around Lake Colac could cost between $29.5 and $46.1 million, depending on the route it takes around the eastern side of the lake.

IDEA: Colac Otway Shire Council is seeking feedback on a proposal for a path around Lake Colac.

A 30.5-kilometre shared walking and cycling path around Lake Colac could cost between $29.5 and $46.1 million, depending on the route it takes around the eastern side of the lake.

Unlock full access to Colac Herald.

Subscribe Now

Comments are closed.

Follow us on Instagram